⚡ GM Decision Brief · AT Apex Command Center
PO-2026-0003 — Precision Aerospace Components Inc.
Value: $350000.00  ·  Routing: GM DECISION REQUIRED  ·  Generated 2026-06-24T18:19:56Z  ·  🕸️ Graph · Neo4j
85%
Brief confidence
PO-2026-0003 from Precision Aerospace Components Inc. (value $350,000.00) has been routed to GM DECISION REQUIRED — order value $350,000.00 ≥ $50,000 threshold. SIOP signals a customer demand spike from Boeing while the supplier is running at 87.0% plant utilisation — a combination that creates delivery schedule risk.
🟠 Demand spike vs. constrained capacity
SIOP Supplier Risk
SIOP signals a customer demand spike at the same time the supplier's plant is running at 87.0% utilisation. Accepting this order at full quantity during a bullwhip spike risks over-committing a constrained supplier — which could cause both this order and existing backlog to slip.
🟠 Sole-source part inside lead time window
Decision Package Supplier Risk
PAC-9001-C is sole-source with no qualified alternate supplier. The requested delivery date falls inside the contractual lead time, triggering a $700,000 expedite fee recommendation. If the supplier cannot perform under expedite conditions, there is no alternative source to pivot to — the expedite fee does not eliminate the risk.
1. HIGH Order value $350,000.00 ≥ $50,000 threshold Decision Package
2. HIGH No matching contract found — new customer or missing reference Decision Package
3. HIGH Expedite fee of $700,000.00 required — delivery inside 30-day contractual lead time Decision Package
4. HIGH GE Aerospace demand signal shows bullwhip amplification (ratio 11.4x) relative to the Boeing 737 MAX build rate anchor (38/month — unchanged). 1 complete spike-correction swing cycle(s) detected in th SIOP
5. MEDIUM Demand signal amplification 11.4× OEM baseline — bullwhip effect detected SIOP
6. MEDIUM On-time rate 77.4% is below 85% threshold Supplier Risk
7. MEDIUM Delivery performance trending worse over trailing 12 months Supplier Risk
8. MEDIUM Maximum lateness of 23 days on single delivery Supplier Risk
⚡ GM Recommended Action
Approve with conditions. Accept order but require supplier capacity confirmation in writing before PO release. Negotiate partial shipment schedule to reduce single-delivery risk. Customer demand may normalize — build in a contractual reschedule clause. Monitor SIOP signals weekly for correction phase.
GM Decision
📄 Decision Package
GM DECISION REQUIRED
95% confidence
⚡ Expedite: $700000
📈 SIOP Demand Signal
HIGH
BULLWHIP_SPIKE · Boeing 737 MAX
11.4× amplification
🛡️ Supplier Risk
MEDIUM
Score 45/100 · Precision Aerospace Components Inc.
⚠ 1 sole-source part(s)
🔒 CMMC Posture
CRITICAL
3 controls · 1% gap
⚠ DFARS 252.204-7012 triggered
Deadline: 2026-11-01
📋 LTA Compliance
VIOLATION
GE Aerospace · Review required
⚠ 1 issue(s) flagged · Delivery window
⏱ Delivery Window
Line 1 (PAC-9001-C): Delivery date is 17 days out — inside the 30-day frozen window. No changes permitted without written GM approval.
AT Apex GM Command Center v1  ·  2026-06-24T18:19:56Z  ·  ← Return to PO Decision Package